bswartz
Structural
- Jul 29, 2010
- 3
I'm looking for some direction on how to approach analyzing an exisiting precast prestressed double tee circa 1960's mfr. by Concrete Masonry Corporation, Inc. (CMC) in Elyria Ohio (out of business). We exposed the rib reinforcing and there is (1) #5 deformed bar 1-1/4" from the bottom, and (1) 7/32" wire strand 1-3/4" above that. The tee is 12" overall deep with 1-1/2" flange/slab thickness (10 1/2" exposed rib/web which tapers 5-1/2" down to 2-1/2". 4'-0" wide, 2'-0" c/c ribs. They span 41 feet and are for roof load in Ohio. Should be around 25 psf LL + 20 psf DL minimum. I found a salesman from that company who thought the prestress was .7ultimate with most strands being 250k yield.