Anyone have any success or experience in using a special design of Sequentially Prestressed Augercast Soldier Pile instead of the normal wide flange sections or tiebacks, including soil nailing?
Have a project where no tiebacks can be used and I am trying to minimize, or eliminate entirely, the use of interior rakers in the pit - three to four story cut.
I anticipate gradually prestressing the piles with multiple tendons, strategically placed in the 30" diameter pile, as the excavation progresses to avoid tension in the concrete, enabling the use of the Gross I section for lateral deflection.
Any thoughts?![[bigears] [bigears] [bigears]](/data/assets/smilies/bigears.gif)
Mike McCann
MMC Engineering
Have a project where no tiebacks can be used and I am trying to minimize, or eliminate entirely, the use of interior rakers in the pit - three to four story cut.
I anticipate gradually prestressing the piles with multiple tendons, strategically placed in the 30" diameter pile, as the excavation progresses to avoid tension in the concrete, enabling the use of the Gross I section for lateral deflection.
Any thoughts?
![[bigears] [bigears] [bigears]](/data/assets/smilies/bigears.gif)
Mike McCann
MMC Engineering