In CSA Z662-11 clause 8.7.4.2 states that the maximum strength test pressure should not produce a deviation of 0.2% from the straight-line proportionality on a P-V plot for the test section. Now I'm not sure if this is an easy question to answer, or if it's detailed...but how does one draw a P-V plot for the test section? Is the starting point basically the volume of the pipeline to the starting pressure in the pipeline, then the next plot would be however much water you add (volume) and the corresponding pressure you get from adding that volume? I'd like to get my head around this and I can't find anything to help me out. If anyone has any links that would be greatly appreciated.