Seaya
Mechanical
- Jul 15, 2010
- 3
I have to over pressure and leak test a duct. I am enclosing each end of the duct to pressure test to an internal presuure of 4" WC (0.14 PSI) gauge. Here lies my question, will I have to pull a partial vacuum or apply positve air pressure to the enclosured space? It appears that I would have to add air pressure but my thoughts are clouded with the effects of atmospheric pressure.