Pls note that there is are major differences between B31.8 code for pipelines and B31.3 code for inplant piping in the treatment of overpressure.
B31.8 code allows the use of an an instrumented safeguarding system (without PSV) of a certain integrity and configuration to allow a design pressure break, provided the hydrotest(??) pressure of the protected downstream component is in excess of the upstream components max operating pressure. My language may be a little loose here, and perhaps a pipeline engineer may correct me, but this is the general hang of it.
Your perception of the use of PSV when dealing with design pressure breaks is what is used in ANSI B31.3, so pls check if this pipeline is a B31.8 or a B31.3 line.