cmsmeng;
Are you designing a PV fabrication shop from scratch or re-modeling or designing a new facility for an existing shop? Understanding PV fabrication in terms of optimizing flow of work on critical pieces of equipment is critical to avoid bottlenecks. Understanding welding needs, material inventory, equipment storage, heat treating (in-house), office space, crane capacity...... the list goes on.
Nondestructive Examination (NDE) can be outsourced or in-house. The biggest effect for NDE is to decide if you want to have radiographic testing capability in-house. This is a financial decision.
I would segregate stainless steel fabrication from carbon and low alloy steel PV fabrication to avoid material mix-up and cross contamination problems with welding/cleaning.