Roupen
Structural
- Jan 20, 2008
- 3
I have the existing plans of a house. I have calculated the soil's working stresses under the home's isolated and strip footings.
The working stress under the isolated footings is 2,000 psf.
The working stress under the strip footings is 1,000 psf.
Am I right in saying that based on this information, the soil's allowable bearing capacity is at least 2,000 psf?
And that I have a reserve of 1,000 psf under the strip footings, thus I can safely add another 1000 psf of pressure?