alumpkin
Structural
- Sep 11, 2000
- 69
Looking for some help for diaphragm action using Precast Channel Slabs ......made back in the 1950's....maybe 1960's. Basically, it is a 8'-0" x 4'-0" x 2-3/4" plank with thicker ribs at the edges. Typically, they are connected to the steel below by a single finger clip at every other channel slab. I have a very large project where the owner is considering renovation or a new facility. The Building Code officials will require that the entire facility be evaluated per our latest IBC codes (2012) and deficient parts and pieces be brought up to code. I am trying to validate a roof diaphragm attached to the steel below but....a thin finger clip is not a legitimate connection. Would all of these panels bind up by friction when loaded? Would I have to go back and begin a process to attach these panels together and then attach the connected panels to the steel framing?