WR7x
Structural
- May 16, 2010
- 1
I was following a house building programme made in the UK. For the floor construction they used a pre-cast deck system. This system beared on a beam which had permanent pre-cast concrete sides, with rebar inside, awaiting wet concrete to be poured inside. No formwork required. Can anyone refer me to the supplier of such a pre-cast beam with permanent formwork?