$ Preloaded Modal Analysis
$
SOL 103
TIME 60
CEND
$*
TITLE = Axial Loading on a Rod - stress stiffening
ECHO = SORT
$*
SUBCASE = 1
$*
SPC = 1
LOAD = 1
$*
SUBCASE = 2
$*
SPC = 1
$DISPLACEMENT(PRINT,PUNCH) = ALL
METHOD = 1
$ take load 1 into account in modal analysis
STATSUB = 1
$*
$*$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$
$*
BEGIN BULK
$*
$* PARAM CARDS
$*
PARAM AUTOSPC YES
PARAM COUPMASS -1
PARAM GRDPNT -1
PARAM OUGCORD GLOBAL
PARAM POST -2
PARAM POSTEXT YES
$*
EIGRL 1 10 0 7 MASS
$*
$* GRID CARDS
$*
GRID 1 0 0.0 0.0 0.0 0
GRID 2 0 2.00000 0.0 0.0 0
GRID 3 0 .200000 0.0 0.0 0
GRID 4 0 .400000 0.0 0.0 0
GRID 5 0 .600000 0.0 0.0 0
GRID 6 0 .800000 0.0 0.0 0
GRID 7 0 1.00000 0.0 0.0 0
GRID 8 0 1.20000 0.0 0.0 0
GRID 9 0 1.40000 0.0 0.0 0
GRID 10 0 1.60000 0.0 0.0 0
GRID 11 0 1.80000 0.0 0.0 0
$*
$* ELEMENT CARDS
$*
CBAR 1 1 1 3 0.01.000000 0.0
CBAR 2 1 3 4 0.01.000000 0.0
CBAR 3 1 4 5 0.01.000000 0.0
CBAR 4 1 6 5 0.0-1.00000 0.0
CBAR 5 1 7 6 0.0-1.00000 0.0
CBAR 6 1 8 7 0.0-1.00000 0.0
CBAR 7 1 9 8 0.0-1.00000 0.0
CBAR 8 1 10 9 0.0-1.00000 0.0
CBAR 9 1 11 10 0.0-1.00000 0.0
CBAR 10 1 11 2 0.01.000000 0.0
$*
$* MATERIAL CARDS
$*
$*
$* I-DEAS Material: 7 name: MATERIAL7
MAT1 7200.00+9 .29000007800.0001.1700-521.85000 0.0+
+ 1.5000+91.5000+96.8000+7
$*
$* PROPERTY CARDS
$*
$*
$* I-DEAS property: 1 name: LINEAR BEAM1
$* Fore Section : 1 name: CARRE
PBAR 1 72.5000-35.2083-75.2083-78.8020-7 0.0 +
+ .0250000.0250000.0250000-.025000-.025000-.025000-.025000.0250000+
+ .8333333.8333333
$*
$* RESTRAINT CARDS
$*
SPC 1 2 2345 0.0
SPC 1 1 12345 0.0
$*
$* LOAD CARDS
$*
FORCE 1 2 01.000000-100000. 0.0 0.0
$*
ENDDATA