priya15
Structural
- Jun 21, 2006
- 19
What should I consider when designing Post Tensioned beam with pour strip in it? Can anyone provide typical detail or design info? Do I design it just like a regular beam as id there is no break but provide pour strip where the tendons stop at CGC of concrete section and call it a day? How do I handle mild reinforcement?