I read the following thread507-146604
Where it have been said that pour strip, in case slab is restrained are adequately spaced if spacing is less than 30m or 100'
My questions are the following:
1)does ACI recommends maximum lengths without pour strips?which one because I can t find it in ACI 224.if not which code in US should I refer to to see recommendations?
2)if pour strip or contraction joints are used adequately(as recommended by ACI) should I still use temerature and shrinkage reinforcement?or putting shrinkage and temperature reinforcement required by aci would enable me to eliminate contraction joint/pour strips
I read the following thread507-146604
Where it have been said that pour strip, in case slab is restrained are adequately spaced if spacing is less than 30m or 100'
My questions are the following:
1)does ACI recommends maximum lengths without pour strips?which one because I can t find it in ACI 224.if not which code in US should I refer to to see recommendations?