The trenches are full depth and long lengths...the need to move kitchen plumbing to different area in the building. After de-stressing and the cable are cut, can I re-anchor the cables and re-stress, or is there another method. Also, the areas that don't have post tensioning, should I heavily conventionally reinforce? This is a bit out of my experience, but a project that needs addressing, nonetheless.