derim01
Structural
- Oct 4, 2008
- 17
Hi...
If we have 10 floor building with in-situ post-tension slabs with bonding tendons.
I am wondering about typical schedule of construction for these floors.
I am clear for steps in case of one slab, but I am not sure about passing to the next floor.
Could we do concreting of the 2nd floor if the first floor isn't yet fully stressed.
Thx for the tips.