Eng-Tips is the largest forum for Engineering Professionals on the Internet.

Members share and learn making Eng-Tips Forums the best source of engineering information on the Internet!

  • Congratulations JStephen on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Post for Vibration Mitigation

Status
Not open for further replies.

Boiler106

Structural
Joined
May 9, 2014
Messages
214
Location
US
i have a post to place under a beam to mitigate vibration issues supporting sensitive equipment.

1_ogidv7.png


I understand from AISC DG11 that this column will need to be jacked into place

2_ymfn0l.png


Does anyone have experience with doing this, either in modelling or construction? I'm trying to decide how much jacking force would be appropriate. Any resources would be helpful.

Thanks
 
I have not done this before. But, I always thought the way to do it was to erect some shoring for the existing beam and jack up that shoring to jack up that shoring to take out the existing deflection and bring it to a more 'neutral' state. Then, construct the column, grout the base plate, etc before releasing the shoring.

 
Thanks Josh. I assumed that it's jacked up to some percentage of the tributary dead load.
 
Status
Not open for further replies.

Part and Inventory Search

Sponsor

Back
Top