Iqbal7
Structural
- May 14, 2012
- 2
We want to install a top hung movable partition wall/ door system on the top floor of a 4 storey school. We need a beam to hang the partition panels of around 300kg total and to support a stud wall above of approx 250kg. As the storey is partially in the attic with sloping ceilings we cannot support the beam on the external Walls and was thinking of a "goal post" arrangement with the beam supported by two columns either end of the 6 metre span.I would like to find out from the knowledgable people here if the slab is likely to be capable of taking the point loads from the columns. By the way the slab is around 200 mm thick in a school which is around 100 yrs old. Many thanks.