Facility has three separate duplex pneumatic sewage ejector stations. This is due to various additions to the facility throughout the past. Ages of the systems are ~44, 38, and 32 years old.
Flow by gravity fills the pots until appropriate level is reached, then valve opens, compressed air from receiver tank forces the waste out and into either a 6", 8", or 12". Operating time is about 15-30 seconds and time between batches is probably 30 minutes. I am estimating the last value.
Looking at your design, something that pops out at me is that it appears it is suited more for continuous operation. With such a small area of flow, I would be concerned with fouling over time, especially the air intake.
Just a first impression.