Graybeard
Chemical
- Jul 10, 2001
- 24
Am currently designing a dilute phase pneumatic transfer system to convey a dense powder. Have a 6 foot lift and a 2 foot lift with about 30 feet horizontal between 2 lifts. Question - should "horizontal" pipe (between 2 lifts) be horizontal, sloped up or down from 1st to 2nd lift. Can find plenty info on velocities and such but no web info on which way if any to slope. Since I can't slope back at 30 deg. my feeling is back slop won't do any good - pipe won't drain clear if I loose air. And no good to slope down to 2nd lift, because that just causes me to lift sloped height differential twice. So am tending to run "horizontal" run horizontal. Suggestions?