Schneidly
Structural
- Jun 9, 2010
- 19
I have a question in another less active part of the forum.
I was hoping to get some input on how to detail a pair of reinforcement beams for a 3ft x3ft saw cut opening in a 12" thick existing suspended slab. The existing slab has a 16ft span. The beam below will also span 16ft. The construction is required to be concrete.
How is the beam "poured" if it is cast directly under an existing slab?
What is the smallest practical size for a beam under these conditions?
If required, how often do core holes through the existing slab need to be? How big should they be?
Please see the other part of the forum for my sketch.
Thanks.
I was hoping to get some input on how to detail a pair of reinforcement beams for a 3ft x3ft saw cut opening in a 12" thick existing suspended slab. The existing slab has a 16ft span. The beam below will also span 16ft. The construction is required to be concrete.
How is the beam "poured" if it is cast directly under an existing slab?
What is the smallest practical size for a beam under these conditions?
If required, how often do core holes through the existing slab need to be? How big should they be?
Please see the other part of the forum for my sketch.
Thanks.