JT100
Mechanical
- Feb 19, 2007
- 71
When analyzing pipeline stability using morisons equations, the stability generally decreases as the wave period is increased. Is this due to to a longer period carrying a larger volume of water and hence generating a larger force on the pipeline? As I would assume that a lower period would also generate larger velocities which would decrease stability? Are either of these correct or is it not this simple? Any advice appreciated.