Julio8287
Industrial
- Dec 1, 2008
- 13
Hi There
I'm in a SCADA commissiong for a gas pipeline (408 km), Emergency Shut Down from Control Room is being set up:
1.- One for metering station, ESD closes all MS valves.
2.- One for Pressure control station, ESD closes all PCS valves.
3.- One for Plant Facility Receiver, ESD closes all PFR valves.
4.- Finally a General ESD that closes all valves.
I would like to know about "standar" or "criteria" to put this ESD in SCADA system.
Thanks in advance