**********************
"Pumping accounts for 20% of the world’s energy used by electric motors and 25-50% of the total electrical energy usage in certain industrial facilities."-DOE statistic (Note: Make that 99% for pipeline companies)
"Or heavier" is an interesting wall thickness. Perhaps B31.3 would be more convenient in determining that dimension.
**********************
"Pumping accounts for 20% of the world’s energy used by electric motors and 25-50% of the total electrical energy usage in certain industrial facilities."-DOE statistic (Note: Make that 99% for pipeline companies)
Do you guys think we need vapor eliminator on top of strainer for said flow conditions. I am having a hard time finding a 3" 300# strainer/vapor eliminator combo in 4-6 weeks LT. I am almost thinking of excluding the option of air elimination and using just the strainer.