Mar 14, 2010 #1 Downhand Industrial Joined Dec 20, 2009 Messages 59 Location CA If the bill of material is calling for a schedule 160 pipe nipple threaded on both ends, can it be replaced by threading schedule 160 pipe?
If the bill of material is calling for a schedule 160 pipe nipple threaded on both ends, can it be replaced by threading schedule 160 pipe?