I cannot speak to what other engineers specify.
If forced to do it, I would specify the distance between hangers be cut in half (every 5 feet), maybe even use a thicker diameter all thread rod (0.875"), maybe even use a hanger that fits over the OD of the pipe, like an Anvil 212 (and use two all thread rods). Depending on the amount of pipe, I might require all three. It is not that much extra compared to what extra excavation and backfill would require.
The different hanger would be because I would be concerned about pipe shift from the areas where loose soil moves around it (at fittings or joints) causing the pipe to lose its uniform downward pitch, maybe even forming a valley.