JimPA
Civil/Environmental
- Jul 17, 2006
- 3
I'm working on a soil vapor extraction (SVE)/sub-slab depressurizatation system. I want to use 2" PVC pipe routed through the building space to connect the roof mounted blower to the SVE points on the floor. I'm wondering if anybody has a refference for pipe air flow limits for silent operation. Thanks!