Vinny7
Structural
- Jan 27, 2003
- 54
I am considering using piles to support drainage (uPVC pipes). In this situation how far apart should the piles be placed and should I specify a beam or precast floor slab unit spanning between piles to give continuous support. If a beam or slab is provided would it need extra piles to stabilise it and how would it be connected to the piles?
Thanks for any help.
Thanks for any help.