I am wrapping up my first pile foundation design. The drawings are currently for review with another engineer (to make sure I did the design correctly). A question was asked with regards to the exterior slabs on grade. Currently I do not have these slabs on piles however, I am being told, from the geotechnical engineer, that these slabs should be place on piles or else they would be prone to settlement. While I agree that they may be prone to settlement I am questioning whether or not it matters if they settle.
There are 3 locations in question. A dumpster pad located next to the building, an apron in front of a drive through door and a pad in front of a loading dock. I can somewhat understand the point about the pad in front of the loading but I’m still not sure if it is necessary.
What do other people do in this instance?
There are 3 locations in question. A dumpster pad located next to the building, an apron in front of a drive through door and a pad in front of a loading dock. I can somewhat understand the point about the pad in front of the loading but I’m still not sure if it is necessary.
What do other people do in this instance?