GoDucks
Structural
- Nov 1, 2005
- 27
The Contractor on a steel pile trestle bent bridge has proposed placing a welded pile splice within the concrete pile cap.
The pile (PP36x1.0) is embedded 36" into the cap and they wish to splice it 4" into the cap (prefabbed top 32" piece)
Would you have a concern in splicing that close to the top? The details of the bent assume that some moment will be developed at the connection and be transferred into the pile.
The pile (PP36x1.0) is embedded 36" into the cap and they wish to splice it 4" into the cap (prefabbed top 32" piece)
Would you have a concern in splicing that close to the top? The details of the bent assume that some moment will be developed at the connection and be transferred into the pile.