Tek-Tips is the largest IT community on the Internet today!

Members share and learn making Tek-Tips Forums the best source of peer-reviewed technical information on the Internet!

  • Congratulations TugboatEng on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Pile movement immediately after detensioning tieback

Status
Not open for further replies.

jdonville

Geotechnical
Joined
Sep 29, 2003
Messages
985
Location
US
Is there any literature on the movement of piles when the ties are released/detensioned? I've been asked to comment on this, but it's the first time anybody has asked. My initial Google has not turned up any obvious results...Any help appreciated.

J
 
I am not aware of any literature. However, I would think that the deflection after detensioning the tiebacks would depend on the quality of the backfill in front of the soldier beams or sheets.

 
In my view, and for a properly designed foundation, such movement should be kept by design to serviceable levels, for the practice is to detension when the basement floors are built and then able to take the inwards forces.

The structural scheme must be valid both under the original tie system and the new, bridging between the new support at basement floor levels. Since these use to be quite close, the span for the inwards push is small and so feasible to sustain high push with reasonable basement walls.

So for construction as described movement should be minimal, and designed to be so.

 
What are you trying to accomplish by detensioning? Are you detensioning after a retaining or basement wall has been built, or are you detensioning after improper tie installation, or are you detensioning because excavation of the soil on the tie side is being performed (poor coordination)?
 
Status
Not open for further replies.

Part and Inventory Search

Sponsor

Back
Top