kapilgupta
Geotechnical
- Jan 14, 2004
- 2
We are consultants for a pile driving project where contractor is driving 100 feet long piles in dense sands. Pile caps have usually 8 to 12 piles in it. How do I find out it Pile group densification is happening. some of the pile caps have uneven embedment of piles within the pile cap. Even though the contractor is driving piles radially outwards, piles driven later in the pile group are sticking 10-15 ft above the initially driven piles within the same group. I would really appreciate any suggestions.
thanks
thanks