RLC32681
Structural
- Nov 5, 2007
- 45
I already finished designing a pile foundation in which the flooring is considered as slab on grade. after driving all the piles in the ground, there was a change in the structural system, instead of using slab on grade we dicided to design it as structural slab because of settlement problem.
After checking the pile capacity that is considering the additional weight coming from the structural slab,grade beam and soil, i notice that the pile reaction exceeds the pile capacity. i am thinking to to add additional piles besides the critical pile making it 3 piles to distribute the pile reactions.
I want to hear your opinions about this. I appreciate if you can suggest other solutions.
After checking the pile capacity that is considering the additional weight coming from the structural slab,grade beam and soil, i notice that the pile reaction exceeds the pile capacity. i am thinking to to add additional piles besides the critical pile making it 3 piles to distribute the pile reactions.
I want to hear your opinions about this. I appreciate if you can suggest other solutions.