Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations waross on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Pile Cap Sub Base Preparation

Status
Not open for further replies.

PAeng22

Structural
Jan 13, 2004
17
What does everyone typically specify for preparation of the sub base under a pile cap? Since the soil is not counted on for bearing support, it seems like a waste to compact it or spend alot of money improving it. There may be some cases where excavation alone will not produce a suitable surface to pour concrete on. I have seen a thin lean concrete layer specified in some cases. I would appreciate any comments or ideas.
 
Replies continue below

Recommended for you

I would agree with your statement. We have specified a concrete mud mat, lean concrete would probably be an equivalent description. Pretty much it would be working slab to allow for construction of the pile cap. Good luck.

Gabriel Molina, PE
 
Poured all my pilecaps on native material or fill over the years with no special preparation required, other than dewatering.

Mike McCann
MMC Engineering

 
Status
Not open for further replies.

Part and Inventory Search

Sponsor