IMHO: I would check with your contractor (if known). Depending on the situation, and location of the project, many would prefer to cast the grade beam/pile caps the full thickness (in your case 1.2m) rather than cast a 500mm thick grade beam and come back and build a 700mm tall stem wall on top. It takes a lot of extra concrete but save forming labor.