posted by SteveBausch
"Why is the vendor not being advised of the need to section the truss?
If the vendor is expected to provide remedy for truss failure, they won't like the surprise of "Oh, we cut them in half for transport".
Be honest with the poor guy. Tell him upfront that the truss needs to be sectioned, and pay him what he asks."
--------------------------
Huh!?
I am the engineer of record. Splicing the truss for transport is at the truss designer's discretion. As some of you have answered as I anticipated, this splice design is ultimately his responsibility. Yes, as the structural engineer, we provide the specifications, general truss layout, and the truss profile and support conditions to which the truss designer must adhere, but the ultimate design of the trusses is left up to him. After all, as someone alluded to, a roof truss is a component. I don't tell him what size gang-nail he needs for chord to web connections, so why would I specify and design a truss splice connection?
methinks you missed the point, Steve.