Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations KootK on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Pier spacing in mud and clay?

Status
Not open for further replies.

txmudman

Electrical
Aug 22, 2007
1
I'm building in a swamp!
We know that there is a layer of clay at the depth of 8'.
I do not know the thickness of this layer of clay.
The outer dimensions will be 24'x40'. Thats 3- 40' shipping containers! If i want more room i may add 2- 20' boxes on top.
 
Replies continue below

Recommended for you

Hire a geotechnical engineer; set up a site investigation and do a proper and professional job about it. It will save you many a grey hair or hair loss!
 
Step 1: Make sure you have appropriate permits from the Corps of Engineers (wetlands and swamps are protected)
Step 2: Identify the consequence of excessive settlement. If you are just placing containers, who cares whether they settle a few inches (a foot)?
Step 3: If you really don't care about settlement and just want a flat place to stage containers, build a level pad. You could install some geotextile separation fabric (i.e., Mirafi 500x) and build your pad out of "hog fuel", which is a coarse-milled wood chip. It's lightweight and will not add to your settlement problem.
Step 4: If you are really building a structure, forget everything I just said and hire a geotechnical engineer.

Good luck.

f-d

¡papá gordo ain’t no madre flaca!
 
Get a house boat for step 5 to add fatdad's comment :). Dont forget to anchor it.

Never, but never question engineer's judgement
 
Status
Not open for further replies.

Part and Inventory Search

Sponsor