I am looking for a pier review of my Excel Spreadsheet created to calculate the storage required for capture in accordance with Phase II requirements of the CWA(i.e. Post-construction minus Pre-Construction).

I will email the spreasheet to anyone interested. The spreadsheet may take some explaining on my part.

I have the HEC-RAS and Tr-55 programs downloaded. I have never been shown how to run them. Therefore, I am having a hard time with input and outputs.

Any suggestions or comments will be greatly appreciated. TY
 
Here is a web link that will take you to a site that has a downloadable excell worksheet for an initial volume estimate. You can use it to compare answers from your sheet or just use it. The link to the sheet is found near the bottom of the web page. This forum asks that we don't post email addresses or phone numbers but if you have any particular questions just post them. I've never used the tr 55 software by itself, always imbedded in another program. I think there is a similar excell sheet for calculating Tc and CN on this web link. I am somewhat familiar with HEC RAS so if you have a question just post and somebody will answer it.
 
Thank you Sam. The site is full of information.
 