Extasis
Materials
- Mar 16, 2006
- 4
Hi there,
I am trying to control a mass flowmeter to input Chemical A into a series of reactors, each with a residence time of 30 mins. I need to dope enough of Chemical A to remove environmentally harmful Chemical B from the reactors (need <1ppm). My analysis sampling point for Chemical B is after Reactor 2, so total residence time is 1 hr (after 2 reactors x 30 mins each).
I am using a PID controller to control the flow of Chemical A into Reactor 1 based on the ppm level of Chemical B out of Reactor 2. It takes approximately 10 mins. to get a ppm reading of Chemical B fed back to the control system.
The problem is that if I change the flow of Chemical A, I do not see the effect of this change for at least 1 hr.
My knowledge of controllers is very limited; I appreciate that this problem may be very basic and so I appreciate any help/ideas I can get!
Thanks in advance!
I am trying to control a mass flowmeter to input Chemical A into a series of reactors, each with a residence time of 30 mins. I need to dope enough of Chemical A to remove environmentally harmful Chemical B from the reactors (need <1ppm). My analysis sampling point for Chemical B is after Reactor 2, so total residence time is 1 hr (after 2 reactors x 30 mins each).
I am using a PID controller to control the flow of Chemical A into Reactor 1 based on the ppm level of Chemical B out of Reactor 2. It takes approximately 10 mins. to get a ppm reading of Chemical B fed back to the control system.
The problem is that if I change the flow of Chemical A, I do not see the effect of this change for at least 1 hr.
My knowledge of controllers is very limited; I appreciate that this problem may be very basic and so I appreciate any help/ideas I can get!
Thanks in advance!