There is a standard proceedure and you should look for it through your local health department. There may be specific criteria pertaining to the hole diameter, depth, depth with respect to the seasonal high water table, soil classification (texture class), pre-soaking (24-hours or so) and data recording. By the way, many local health departments are allowing soil profiles and texture classification correlation in lieu of doing the perc test. I trust that the ultimate goal is to design a drain field. If you are striving to desing an infiltraiton trench or to somehow derive permeability you may be barking up the wrong tree.
f-d
¡papá gordo ain’t no madre flaca!