Site is Sunnyvale,Ca. in Santa Clara County. Ground water is 110 ft down. Top 8 ft. is top soil, then 15 ft of Sandy Clay (ML), 10 ft. of sandy clay with gravel (CL), and then 40 ft. of gravelly silty clay(ML-CL). I have 11,000 sf of pavement area and an occasional 1500 gal load of water from a vacuum truck. My conceptual design is 925 sf by 2 ft deep for storage with 1 ft. each of sand and then drain rock below. The storm outlet will be in the rock portion. Filter fabric will be utilized as material barrier. Any guess at the infiltration rate? I would like to limit standing water to 5-7 days max.