I know this has been beat to death here, but do you guys handle engineering/ upgrades to PEMB's?
I have a customer who wants to upgrade crane capacity to a a crane runway that is on brackets on a PEMB moment frame.
I have no experience to PEMB frames.
I can handle everything up to and including the bracket but from there should I inform the owner that he must contact the PEMB manufacturer?
I want nothing to to with analyzing the PEMB frame (not the first time I have been down this road either!)
Thoughts are much appreciated.
I have a customer who wants to upgrade crane capacity to a a crane runway that is on brackets on a PEMB moment frame.
I have no experience to PEMB frames.
I can handle everything up to and including the bracket but from there should I inform the owner that he must contact the PEMB manufacturer?
I want nothing to to with analyzing the PEMB frame (not the first time I have been down this road either!)
Thoughts are much appreciated.