mlevario99
Structural
- Aug 26, 2008
- 26
A General Contractor is doing a school where they are the CM at Risk. We were not the EOR of the project, but we know both, the Generral Contractor and the Architect of Record. The contractor came to us, and ask us to do a peer review of the construction documents, what is the right thing to do, to let the Archtiect know that you are doing a peer review, or not tell him. Do we need to let also the EOR of the project know what we are doing.
Thanks for your help