tramphardrocker
Geotechnical
- May 7, 2007
- 3
For a mobile home park using 8000gpd or 5.5gpm I used a peak flow factor of 30 (small population factor) to arrive at about 150gpm for peak flow period. Is this an acceptable method?
Follow along with the video below to see how to install our site as a web app on your home screen.
Note: This feature may not be available in some browsers.