I am being asked to supply test procedures that I have used to test relay logic wiring on MV Switchgear for a publicly posted follow-up bid process. I only shared these with people inside our company until now and the previous swgr was tested only with my full attendance and oversight This is for multiple identical switchgear we operate, not manufacture, but I am technical lead in charge of modifications to them.
Do such test procedures require my stamp? I feel so because of how integral and detailed they are in connection with the drawings I stamped. These procedures involve adding temp jumpers, removing wires, etc. These procedures test my engineering knowledge more than the drawing modifications.
What should I be careful of if I stamp them?
Do such test procedures require my stamp? I feel so because of how integral and detailed they are in connection with the drawings I stamped. These procedures involve adding temp jumpers, removing wires, etc. These procedures test my engineering knowledge more than the drawing modifications.
What should I be careful of if I stamp them?