Does anyone have experience with PCC Paving with no subbase?
I have a design build project, I am the structural engineer, where the GC has a parking lot paving design without a subbase and wants to use it because it is cheaper. I am not familiar with this practice and some issues at the site concern me, as they do the Arch on the project.
The site has a high water table as well as a steep slope down to the paving area. Lean clays and silty to sandy clays are present in the top 4 feet of the site and could possibly be uncompacted fill.
I do not have the slab design or the site prep that is proposed to be followed.
Just looking for general opinions on the practice.
I have a design build project, I am the structural engineer, where the GC has a parking lot paving design without a subbase and wants to use it because it is cheaper. I am not familiar with this practice and some issues at the site concern me, as they do the Arch on the project.
The site has a high water table as well as a steep slope down to the paving area. Lean clays and silty to sandy clays are present in the top 4 feet of the site and could possibly be uncompacted fill.
I do not have the slab design or the site prep that is proposed to be followed.
Just looking for general opinions on the practice.