DWHA
Structural
- Jan 31, 2007
- 315
I am a structural engineer and am not real familiar with pavement designs. My question is this. Is it common to place PPC Pavement without the use of any steel reinforcing? The firm that I worked for as an inspector during the summers when I was going to school commonly called out for 8” of PPC over a prepared subbase. There was not even any steel for temperature and shrinkage. They did this for building entrances and subdivision streets. The only designs that I do that are similar to this are slabs on grade, not really a pavement, but the firm that I work for now always puts at least the minimum in for temperature and shrinkage. What do others do?