Hello Everyone. I am working on an increasing the live load capacity of an existing structure. I would like to remove the existing 4" concrete floor slab and replace it with a 6" concrete floor slab at the original elevation, thereby encasing the beam flanges in 2" of concrete. Does anyone know if it is possible to look at this beam as a partially composite beam in some way? I just want to rely on the friction between the two materials and not add any shear connectors. Thanks for your help.