dlk's "Time and time again..."
I eventually closed my practice rather than gypo, and went to work for a 'dark side' D-B property developer as in-house engineer. I found it's not the developers, it's the contracted A/E's and GC subcontractors! The looting!! The looting!! One structural hit us for $500,000 in fees, and said to my face, "Don't worry about the (85% design submittal marked 'For Construction'), we'll take care of 'minor' design-detailing changes by CHANGE ORDER." Not for $500,000 in design fees we won't!!!
I found at least 20 lapses, a total lack of detailing, but all they'd give us to review with was the bulk computer printout, yet they were able to get a construction permit from the City B.O. with that 'engineering submittal'!! So we had to pay them for 'construction ready plans', then fire them from the CM portion of the project, ...but sure enough, we had to BUY OUT their CM contract portion.
Then GC subcontractor CO gouging ... O...M...G~! In the historical accounts of the Mortgage.Con, when we sit by the fire, nobody will ever know how many lives were saved from shoddy D-B gypos by that 'untimely' end to the Great R/E Bubble. I would never buy any property built in the 2000s.
Now it looks like a whole generation of graduating engineers will be lost.