Hi everyone,
I was having a discussion with an aerospace partner recently about part numbering conventions in PDM systems, and it got me thinking - how do different organizations approach this challenge?
One approach I've seen is a hierarchical naming scheme that embeds mission/project context directly in the filename structure, something like:MISSION_PARTNO_NAME_REV.SUBREV
For example: PROJ-A_4301-01-00_ReactionWheels_01 or PROJ-A_32010200_PCBBottom_01.01
Where the 8-digit part numbers create a hierarchy (4000s = platform, 3200s = power, etc.) and COTS parts get handled separately.
It seems like aerospace has some unique challenges compared to other engineering sectors - the mission-critical nature, long product lifecycles, and traceability requirements. I'm wondering if this drives different approaches to part numbering than you'd see in automotive or consumer products.
What approaches have you found work best for your organizations?
Some follow-up thoughts: Do you embed project identifiers directly in part numbers, or rely on the PLM system to manage those relationships? How do you handle COTS integration? Any thoughts on hierarchical vs flat numbering schemes?
Would love to hear about your experiences, especially if you've been through PLM migrations or evolved your naming conventions over time.
Thanks!
I was having a discussion with an aerospace partner recently about part numbering conventions in PDM systems, and it got me thinking - how do different organizations approach this challenge?
One approach I've seen is a hierarchical naming scheme that embeds mission/project context directly in the filename structure, something like:MISSION_PARTNO_NAME_REV.SUBREV
For example: PROJ-A_4301-01-00_ReactionWheels_01 or PROJ-A_32010200_PCBBottom_01.01
Where the 8-digit part numbers create a hierarchy (4000s = platform, 3200s = power, etc.) and COTS parts get handled separately.
It seems like aerospace has some unique challenges compared to other engineering sectors - the mission-critical nature, long product lifecycles, and traceability requirements. I'm wondering if this drives different approaches to part numbering than you'd see in automotive or consumer products.
What approaches have you found work best for your organizations?
Some follow-up thoughts: Do you embed project identifiers directly in part numbers, or rely on the PLM system to manage those relationships? How do you handle COTS integration? Any thoughts on hierarchical vs flat numbering schemes?
Would love to hear about your experiences, especially if you've been through PLM migrations or evolved your naming conventions over time.
Thanks!