The situation I have, at Niagara Bottling, in Ontario,Ca., is that they purchased a package system from ACP, and they are running three pumps at the same time, then added a forth, thinking that all four pumps are equal to 2400 G.P.M.'s, which I think is far from being correct. I undewrstand that two pumps will double the flow, but after that I feel the other pumps may increase the flow very little. Am I correct???