after the blackout of a Large Grid, the restoration of the system begins by SE-230kV substation;
As a start, SE-230 is found to have two independent busbas 230kV energized;
The A-busbar is connected to A-load a priority that is being supplied by the A-power plant via a 110km -230kV line.
B-busBar is connected to high-priority B-load which is being supplied with the B-power plant through a 10km-230kV line.
system B defines the frequency of Large Grid. It is necessary to connect the A-busbar with B-busbar to continue the restoration of Large Grid.
You must install a synchronization system in the SE-230kV;
question:
1 - that is parallel or synchronism of system A to B?
2 - What would the procedure for the synchronization (or parallelism) knowing that the A-powerplant is 100km away.
As a start, SE-230 is found to have two independent busbas 230kV energized;
The A-busbar is connected to A-load a priority that is being supplied by the A-power plant via a 110km -230kV line.
B-busBar is connected to high-priority B-load which is being supplied with the B-power plant through a 10km-230kV line.
system B defines the frequency of Large Grid. It is necessary to connect the A-busbar with B-busbar to continue the restoration of Large Grid.
You must install a synchronization system in the SE-230kV;
question:
1 - that is parallel or synchronism of system A to B?
2 - What would the procedure for the synchronization (or parallelism) knowing that the A-powerplant is 100km away.